Work Breakdown Structures  Assignment

Want create site? With you can do it easy.

Work Breakdown Structures  Assignment

Work Breakdown Structures  Assignment

Don't use plagiarized sources. Get Your Custom Essay on
Work Breakdown Structures  Assignment
From $8/Page
Order Essay

Work Breakdown Structures  Assignment

Question Description
To prepare:

Review this week’s Learning Resources on work breakdown structures.
Thoroughly examine the Team Project Overview document in this week’s Learning Resources to familiarize yourself with the requirements of this Assignment.
Engage in discussion with your team members on how you will collaborate, distribute work, and submit the Assignment.
THEN
To complete Part 2 of your Team Project:

Collaborate on a 2- to 3-page paper that summarizes the group’s work and includes a WBS diagram of at least five high-level deliverables and a list of relevant tasks and subtasks. Follow the guidelines provided in the Team Project Overview document found in this week’s Learning Resources.
1.1 – Project Team Formation-Nedra

1.2- Hardware/Software Acquisition-Janet

1.3 -Training-Lakeisha

1.4- Test plan-

1.5- Implementation-

Just do the 1.4 TEST PLAN ONLY

Please attachments for reference. If you need some info or you need to log in to my account. Just tell me. I’ll give you a tip after you finish. Thanks.

You must proofread your paper. But do not strictly rely on your computer’s spell-checker and grammar-checker; failure to do so indicates a lack of effort on your part and you can expect your grade to suffer accordingly. Papers with numerous misspelled words and grammatical mistakes will be penalized. Read over your paper – in silence and then aloud – before handing it in and make corrections as necessary. Often it is advantageous to have a friend proofread your paper for obvious errors. Handwritten corrections are preferable to uncorrected mistakes.

Use a standard 10 to 12 point (10 to 12 characters per inch) typeface. Smaller or compressed type and papers with small margins or single-spacing are hard to read. It is better to let your essay run over the recommended number of pages than to try to compress it into fewer pages.

Likewise, large type, large margins, large indentations, triple-spacing, increased leading (space between lines), increased kerning (space between letters), and any other such attempts at “padding” to increase the length of a paper are unacceptable, wasteful of trees, and will not fool your professor.

The paper must be neatly formatted, double-spaced with a one-inch margin on the top, bottom, and sides of each page. When submitting hard copy, be sure to use white paper and print out using dark ink. If it is hard to read your essay, it will also be hard to follow your argument.

ADDITIONAL INSTRUCTIONS FOR THE CLASS

Discussion Questions (DQ)

Initial responses to the DQ should address all components of the questions asked, include a minimum of one scholarly source, and be at least 250 words.
Successful responses are substantive (i.e., add something new to the discussion, engage others in the discussion, well-developed idea) and include at least one scholarly source.
One or two sentence responses, simple statements of agreement or “good post,” and responses that are off-topic will not count as substantive. Substantive responses should be at least 150 words.
I encourage you to incorporate the readings from the week (as applicable) into your responses.
Weekly Participation

Your initial responses to the mandatory DQ do not count toward participation and are graded separately.
In addition to the DQ responses, you must post at least one reply to peers (or me) on three separate days, for a total of three replies.
Participation posts do not require a scholarly source/citation (unless you cite someone else’s work).
Part of your weekly participation includes viewing the weekly announcement and attesting to watching it in the comments. These announcements are made to ensure you understand everything that is due during the week.
APA Format and Writing Quality

Familiarize yourself with APA format and practice using it correctly. It is used for most writing assignments for your degree. Visit the Writing Center in the Student Success Center, under the Resources tab in LoudCloud for APA paper templates, citation examples, tips, etc. Points will be deducted for poor use of APA format or absence of APA format (if required).
Cite all sources of information! When in doubt, cite the source. Paraphrasing also requires a citation.
I highly recommend using the APA Publication Manual, 6th edition.
Use of Direct Quotes

I discourage overutilization of direct quotes in DQs and assignments at the Masters’ level and deduct points accordingly.
As Masters’ level students, it is important that you be able to critically analyze and interpret information from journal articles and other resources. Simply restating someone else’s words does not demonstrate an understanding of the content or critical analysis of the content.
It is best to paraphrase content and cite your source.
LopesWrite Policy

For assignments that need to be submitted to LopesWrite, please be sure you have received your report and Similarity Index (SI) percentage BEFORE you do a “final submit” to me.
Once you have received your report, please review it. This report will show you grammatical, punctuation, and spelling errors that can easily be fixed. Take the extra few minutes to review instead of getting counted off for these mistakes.
Review your similarities. Did you forget to cite something? Did you not paraphrase well enough? Is your paper made up of someone else’s thoughts more than your own?
Visit the Writing Center in the Student Success Center, under the Resources tab in LoudCloud for tips on improving your paper and SI score.
Late Policy

The university’s policy on late assignments is 10% penalty PER DAY LATE. This also applies to late DQ replies.
Please communicate with me if you anticipate having to submit an assignment late. I am happy to be flexible, with advance notice. We may be able to work out an extension based on extenuating circumstances.
If you do not communicate with me before submitting an assignment late, the GCU late policy will be in effect.
I do not accept assignments that are two or more weeks late unless we have worked out an extension.
As per policy, no assignments are accepted after the last day of class. Any assignment submitted after midnight on the last day of class will not be accepted for grading.
Communication

Communication is so very important. There are multiple ways to communicate with me:Questions to Instructor Forum: This is a great place to ask course content or assignment questions. If you have a question, there is a good chance one of your peers does as well. This is a public forum for the class.
Individual Forum: This is a private forum to ask me questions or send me messages. This will be checked at least once every 24 hours.

Did you find apk for android? You can find new and apps.

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 20% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with Top Writers 4Me
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 10k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Mathematics
Thank you so much!
Customer 452483, July 26th, 2021
History
thank you
Customer 452639, January 24th, 2023
Nursing
Excellent job! super recommended.
Customer 452487, August 24th, 2021
Education
Great good
Customer 452555, February 14th, 2022
English 101
Perfect! Thank you so much for all of your hard work and help! Appreciate it!!
Customer 452483, August 30th, 2021
English 101
I would like to thank you for the writing, it was a very busy week for me and had no time this week to do a writing. I would recommend you to others and would utilize you again.
Customer 452639, October 16th, 2022
Psychology
On point! Appreciate all the hard work!!
Customer 452483, August 16th, 2021
Nursing
Good job! Thank you.
Customer 452487, October 26th, 2021
Nursing
Good job. Thank you
Customer 452487, September 16th, 2021
Communications
You're awesome! Thank you so much!
Customer 452483, July 27th, 2021
English 101
Thank you guys for always being there and helping me always get a 100% on my assignments!
Customer 452483, August 16th, 2021
Microbiology
Perfect! Thank you guys for all of your great help! :)
Customer 452483, August 23rd, 2021
1159
Customer reviews in total
96%
Current satisfaction rate
2 pages
Average paper length
47%
Customers referred by a friend
OUR GIFT TO YOU
20% OFF your first order
Use a coupon TOP20 and enjoy expert help with any task at the most affordable price.
Claim my 20% OFF Order in Chat