Supply Chain Management
Performance Measurement in Supply Chain ManagementIndividual ProjectPerformance Measurement of a major Function or Process in SCMObjective: Describe Performance Measurement for a Function or Process within Supply ChainManagement, other than Warehousing. You can use the template I shared with you on Warehousing, i.e.cover Quality measures, Utilization measures, Productivity measures, andPerformance measures as a background.Start by choosing a product. The project content is flexible but the project should start with a diagram of the basic industry supply chain of your chosen product. This supply chain could be anactual supply chain that you are familiar or it could be a supply chain that you develop using research to determine what is generally included in the production and delivery of your chosen product. From the basic supply chain ascertain what the corporate and supply chain goals or customer needs are specifically (strategies). In other words – Why does the supply chain exist? From that, a set of general measurements should be proposed. A written overview of the project should be submitted in both hardcopy and in a word file. There is not a limitation on length of the written report, but a good guide would be six double spaced pages.
